Description
This SCE Approved Meter Socket Comes with install.
Approved panel must be:
208v-480v
100-200 amp
3 phase
Nema 3r rating
Note:
Rewiring of your current panel included, this does not include edison wiring to grid.
This SCE Approved Meter Socket Comes with install.
Approved panel must be:
208v-480v
100-200 amp
3 phase
Nema 3r rating
Note:
Rewiring of your current panel included, this does not include edison wiring to grid.